How to perform a Bump Test
- Put your controller in Manual Mode so the output is locked. Wait for the process variable to completely stabilize.
- Record your starting Output (CV1) and starting Process Variable (PV1).
- Make a sudden, step change to your output (e.g., jump from 20% to 40%). Record this as CV2.
- Start the chronometer the exact moment you make the bump.
- When the Process Variable finally begins to move, click Lap 1 (This is your Dead Time).
- Wait for the Process Variable to reach a new steady state and stop moving. Record this as PV2.
- Calculate your 63.2% mark:
PV1 + (0.632 * (PV2 - PV1)). (If you are using the chronometer live, watch the gauge until it hits this number, then click Lap 2)
Raw Data Input
Live Chronometer
Use this on the factory floor to record your times, or just type them manually on the left.
Step 1: Make your Output Bump
00:00.0
Calculated Model (FOPDT)
Process Gain (K):
2.00
Time Constant (τ):
15.0 s
Dead Time (θ):
5.0 s